Tadelakt Progress, Friday 24th February, 2017

apcolborne 25 February, 2017 Villa154 Read more

Decoration Progress, Friday 24th February, 2017

apcolborne 25 February, 2017 Villa154 Read more

Jardin Andalou, Thursday 16th February, 2017

apcolborne 25 February, 2017 Villa154 Read more

Bedroom 6 Progress, Thursday 16th February, 2017

apcolborne 25 February, 201725 February, 2017 Villa154 Read more

Roof terraces, Thursday 16th February, 2017

apcolborne 25 February, 2017 Villa154 Read more

Inner Courtyard, Thursday 16th February, 2017

apcolborne 25 February, 2017 Villa154 Read more

Decoration Progress, Thursday 16th February, 2017

apcolborne 25 February, 2017 Villa154 Read more

Villa Entrance, Thursday 16th February, 2017

apcolborne 25 February, 2017 Villa154 Read more

Front door installation, Monday 13th February, 2017

apcolborne 25 February, 2017 Villa154 Read more

Decoration Progress, Monday 13th February, 2017

apcolborne 25 February, 2017 Villa154 Read more

Metalwork Progress, Monday 13th February, 2017

apcolborne 25 February, 2017 Villa154 Read more

Bejmet Progress, Monday 13th February, 2017

apcolborne 25 February, 2017 Villa154 Read more

Decoration progress, Friday 10th February, 2017

apcolborne 10 February, 2017 Villa154 Read more

Bejmet progress, Friday 10th February, 2017

apcolborne 10 February, 2017 Villa154 Read more

Plaster progress, Thursday 9th January, 2017

apcolborne 9 February, 2017 Villa154 Read more

Decoration progress, Thursday 9th January, 2017

apcolborne 9 February, 2017 Villa154 Read more

Bejmet progress, Thursday 9th January, 2017

apcolborne 9 February, 2017 Villa154 Read more

Decoration progress, Wednesday 8th February, 2017

apcolborne 8 February, 20178 February, 2017 Villa154 Read more

Bejmet progress, Wednesday 8th February, 2017

apcolborne 8 February, 2017 Villa154 Read more

Decoration progress, Wednesday 8th February, 2017

apcolborne 8 February, 2017 Villa154 Read more

Tadelakt progress, Wednesday 8th February, 2017

apcolborne 8 February, 2017 Villa154 Read more

Marble progress, Wednesday 8th February, 2017

apcolborne 8 February, 2017 Villa154 Read more

Bejmet progress, Wednesday 8th February, 2017

apcolborne 8 February, 2017 Villa154 Read more

Zellige, Wednesday 8th February, 2017

apcolborne 8 February, 2017 Villa154 Read more

Plaster progress, Wednesday 8th February, 2017

apcolborne 8 February, 2017 Villa154 Read more

Entrance path progress, Saturday 28th January, 2017

apcolborne 29 January, 2017 Villa154 Read more

Pise progress, Saturday 28th January, 2017

apcolborne 29 January, 2017 Villa154 Read more

Plaster progress, Saturday 28th January, 2017

apcolborne 29 January, 2017 Villa154 Read more

Plaster progress, Friday 27th January, 2017

apcolborne 27 January, 2017 Villa154 Read more

Entrance path construction, Thursday 26th January, 2017

apcolborne 27 January, 2017 Villa154 Read more

Plaster progress, Thursday 26th January, 2017

apcolborne 27 January, 2017 Villa154 Read more

Swimming pool progress, Monday 9th January, 2017

apcolborne 9 January, 2017 Villa154 Read more

Plaster progress, Monday 9th January, 2017

apcolborne 9 January, 2017 Villa154 Read more

Carpentry progress, Monday 9th January, 2017

apcolborne 9 January, 2017 Villa154 Read more

Plaster progress, Saturday 7th January, 2017

apcolborne 7 January, 2017 Villa154 Read more

Carpentry progress, Saturday 7th January, 2017

apcolborne 7 January, 2017 Villa154 Read more

Carpentry progress, Friday 6th January, 2017

apcolborne 6 January, 2017 Villa154 Read more

Pise progress, Friday 6th January, 2017

apcolborne 6 January, 2017 Villa154 Read more

Decoration progress, Friday 6th January, 2017

apcolborne 6 January, 2017 Villa154 Read more

Plaster progress, Thursday 5th January, 2017

apcolborne 6 January, 2017 Villa154 Read more

Carpentry progress, Thursday 5th January, 2017

apcolborne 6 January, 2017 Villa154 Read more

Pise progress, Thursday 5th January, 2017

apcolborne 6 January, 2017 Villa154 Read more

Zellige progress, Thursday 5th January, 2017

apcolborne 6 January, 2017 Villa154 Read more

Bejmet progress, Wednesday 4th January, 2017

apcolborne 6 January, 2017 Villa154 Read more

Decoration progress, Wednesday 4th January, 2017

apcolborne 6 January, 20176 January, 2017 Villa154 Read more

Carpentry progress, Wednesday 4th January, 2017

apcolborne 6 January, 2017 Villa154 Read more

Decoration progress, Tuesday 3rd January, 2017

apcolborne 6 January, 2017 Villa154 Read more

Tadelakt progress, Tuesday 3rd January, 2017

apcolborne 6 January, 2017 Villa154 Read more

Bejmet progress, Tuesday 3rd January, 2017

apcolborne 6 January, 2017 Villa154 Read more

Bejmet progress, Monday 2nd January, 2017

apcolborne 2 January, 20172 January, 2017 Villa154 Read more

Bathroom tiling progress, Friday 30th December, 2016

apcolborne 30 December, 2016 Villa154 Read more

Tadelakt progress, Friday 30th December, 2016

apcolborne 30 December, 2016 Villa154 Read more

Plaster progress, Friday 30th December, 2016

apcolborne 30 December, 2016 Villa154 Read more

Tadelakt progress, Saturday 10th December, 2016

apcolborne 10 December, 2016 Villa154 Read more

Decoration progress, Saturday 10th December, 2016

apcolborne 10 December, 2016 Villa154 Read more

Carpentry progress, Friday 9th December, 2016

apcolborne 9 December, 2016 Villa154 Read more

Decoration progress, Friday 9th December, 2016

apcolborne 9 December, 20169 December, 2016 Villa154 Read more

Tadelakt progress, Friday 9th December, 2016

apcolborne 9 December, 2016 Villa154 Read more

Carpentry progress, Thursday 8th December, 2016

apcolborne 8 December, 2016 Villa154 Read more

Tadelakt progress, Thursday 8th December, 2016

apcolborne 8 December, 2016 Villa154 Read more

Decoration progress, Thursday 8th December, 2016

apcolborne 8 December, 2016 Villa154 Read more

Fireplace alterations, Thursday 8th December, 2016

apcolborne 8 December, 2016 Villa154 Read more

Tadelakt progress, Wednesday 7th December, 2016

apcolborne 7 December, 2016 Villa154 Read more

Decoration progress, Wednesday 7th December, 2016

apcolborne 7 December, 2016 Villa154 Read more

Chimney alternations, Wednesday 7th December, 2016

apcolborne 7 December, 2016 Villa154 Read more

Carpentry progress, Wednesday 7th December, 2016

apcolborne 7 December, 2016 Villa154 Read more

Garden progress, Wednesday 7th December, 2016

apcolborne 7 December, 2016 Villa154 Read more

Building works progress, Tuesday 6th December, 2016

apcolborne 6 December, 2016 Villa154 Read more

Bejmet progress, Tuesday 6th December, 2016

apcolborne 6 December, 2016 Villa154 Read more

Bathroom tiling progress, Tuesday 6th December, 2016

apcolborne 6 December, 2016 Villa154 Read more

Carpentry progress, Tuesday 6th December, 2016

apcolborne 6 December, 2016 Villa154 Read more

Tadelakt progress, Tuesday 6th December, 2016

apcolborne 6 December, 2016 Villa154 Read more

Decoration progress, Tuesday 6th December, 2016

apcolborne 6 December, 2016 Villa154 Read more

Bathroom tiling progress, Monday 5th December, 2016

apcolborne 6 December, 2016 Villa154 Read more

Tadelakt progress, Monday 5th December, 2016

apcolborne 6 December, 2016 Villa154 Read more

Decoration progress, Monday 5th December, 2016

apcolborne 6 December, 2016 Villa154 Read more

Garden progress, Monday 5th December, 2016

apcolborne 6 December, 2016 Villa154 Read more

Carpentry progress, Monday 5th December, 2016

apcolborne 6 December, 2016 Villa154 Read more

Plaster colour samples, Monday 5th December, 2016

apcolborne 6 December, 2016 Villa154 Read more

Gardening progress, Saturday 3rd December, 2016

apcolborne 3 December, 2016 Villa154 Read more

Pise progress, Saturday 3rd December, 2016

apcolborne 3 December, 2016 Villa154 Read more

Bejmet progress, Saturday 3rd December, 2016

apcolborne 3 December, 2016 Villa154 Read more

Carpentry progress, Saturday 3rd December, 2016

apcolborne 3 December, 2016 Villa154 Read more

Fireplace alterations, Saturday 3rd December, 2016

apcolborne 3 December, 2016 Villa154 Read more

Decoration progress, Saturday 3rd December, 2016

apcolborne 3 December, 2016 Villa154 Read more

Bathroom tiling progress, Saturday 3rd December, 2016

apcolborne 3 December, 2016 Villa154 Read more

Decoration progress, Friday 2nd December, 2016

apcolborne 2 December, 20163 December, 2016 Villa154 Read more

Carpentry progress, Friday 2nd December, 2016

apcolborne 2 December, 20163 December, 2016 Villa154 Read more

Bejmet progress, Friday 2nd December, 2016

apcolborne 2 December, 20163 December, 2016 Villa154 Read more

Tadelakt progress, Friday 2nd December, 2016

apcolborne 2 December, 20163 December, 2016 Villa154 Read more

Bathroom tiling progress, Thursday 1st December, 2016

apcolborne 2 December, 20163 December, 2016 Villa154 Read more

The Villa, Thursday 1st December, 2016

apcolborne 2 December, 2016 Villa154 Read more

Garden progress, Thursday 1st December, 2016

apcolborne 2 December, 2016 Villa154 Read more

Decoration progress, Thursday 1st December, 2016

apcolborne 2 December, 2016 Villa154 Read more

Plaster progress, Thursday 1st December, 2016

apcolborne 2 December, 2016 Villa154 Read more

Bathroom tiling progress, Wednesday 30th November, 2016

apcolborne 2 December, 2016 Villa154 Read more

Plaster progress, Wednesday 30th November, 2016

apcolborne 2 December, 20162 December, 2016 Villa154 Read more

Garden progress, Wednesday 30th November, 2016

apcolborne 2 December, 2016 Villa154 Read more

Door and window furniture choices, Wednesday 30th November, 2016

apcolborne 2 December, 2016 Villa154 Read more

Second fix electrical choices, Wednesday 30th November, 2016

apcolborne 2 December, 2016 Villa154 Read more

Plaster progress, Wednesday 30th November, 2016

apcolborne 2 December, 20162 December, 2016 Villa154 Read more

Decoration progress, Tuesday 29th November, 2016

apcolborne 2 December, 2016 Villa154 Read more

Marble Selection, Tuesday 29th November, 2016

apcolborne 2 December, 2016 Villa154 Read more

Bejmet progress, Monday 28th November, 2016

apcolborne 2 December, 2016 Villa154 Read more

Decoration progress, Monday 28th November, 2016

apcolborne 2 December, 2016 Villa154 Read more

Garden progress, Monday 28th November, 2016

Carpentry progress, Monday 28th November, 2016

apcolborne 2 December, 2016 Villa154 Read more

Plaster progress, Monday 28th November, 2016

apcolborne 2 December, 2016 Villa154 Read more

Bathroom tiling progress, Monday 28th November, 2016

apcolborne 2 December, 2016 Villa154 Read more

Carpentry progress, Monday 28th November, 2016

apcolborne 2 December, 20162 December, 2016 Villa154 Read more

Plaster progress, Saturday 26th November, 2016

apcolborne 26 November, 2016 Villa154 Read more

Electrical progress, Saturday 26th November, 2016

apcolborne 26 November, 2016 Villa154 Read more

Decoration progress, Saturday 26th November, 2016

apcolborne 26 November, 201626 November, 2016 Villa154 Read more

Tadelakt progress, Saturday 26th November, 2016

apcolborne 26 November, 2016 Villa154 Read more

Plaster progress, Friday 25th November, 2016

apcolborne 26 November, 2016 Villa154 Read more

Bathroom tiling progress, Friday 25th November, 2016

apcolborne 26 November, 2016 Villa154 Read more

Tadelakt progress, Friday 25th November, 2016

apcolborne 26 November, 2016 Villa154 Read more

Decoration progress, Friday 25th November, 2016

apcolborne 26 November, 2016 Villa154 Read more

Chimney alterations, Thursday 24th November, 2016

apcolborne 25 November, 2016 Villa154 Read more

Bathroom tiling, Thursday 24th November, 2016

apcolborne 25 November, 2016 Villa154 Read more

Plaster progress, Wednesday 23rd November, 2016

apcolborne 23 November, 2016 Villa154 Read more

Decoration progress, Wednesday 23rd November, 2016

apcolborne 23 November, 201623 November, 2016 Villa154 Read more

Bejmet progress, Wednesday 23rd November, 2016

 

apcolborne 23 November, 2016 Villa154 Read more

Tadelakt samples, Tuesday 22nd November, 2016

apcolborne 22 November, 2016 Villa154 Read more

Plaster progress, Tuesday 22nd November, 2016

apcolborne 22 November, 2016 Villa154 Read more

Decoration progress, Tuesday 22nd November, 2016

apcolborne 22 November, 2016 Villa154 Read more

Bathroom tiling progress, Tuesday 22nd November, 2016

apcolborne 22 November, 2016 Villa154 Read more

Bejmet progress, Tuesday 22nd November, 2016

apcolborne 22 November, 2016 Villa154 Read more

Plaster progress, Monday 21st November, 2016

apcolborne 21 November, 2016 Villa154 Read more

Tadelakt progress, Monday 21st November, 2016

apcolborne 21 November, 2016 Villa154 Read more

Decoration progress, Monday 21st November, 2016

apcolborne 21 November, 2016 Villa154 Read more

Plaster progress, Saturday 19th November, 2016

apcolborne 19 November, 2016 Villa154 Read more

Decoration progress, Saturday 19th November, 2016

apcolborne 19 November, 2016 Villa154 Read more

Tadelakt progress, Saturday 19th November, 2016

apcolborne 19 November, 2016 Villa154 Read more

Zellige progress, Saturday 19th November, 2016

apcolborne 19 November, 2016 Uncategorized Read more

Pise progress, Saturday 19th November, 2016

apcolborne 19 November, 2016 Villa154 Read more

Bathroom tiling progress, Saturday 19th November, 2016

apcolborne 19 November, 2016 Villa154 Read more

Decoration progress, Friday 18th November, 2016

apcolborne 18 November, 2016 Villa154 Read more

Zellige progress, Friday 18th November, 2016

apcolborne 18 November, 2016 Villa154 Read more

Carrelage progress, Friday 18th November, 2016

apcolborne 18 November, 2016 Villa154 Read more

Tadelakt progress, Friday 18th November, 2016

apcolborne 18 November, 2016 Villa154 Read more

Plaster progress, Thursday 17th November, 2016

apcolborne 18 November, 2016 Villa154 Read more

Tadelakt progress, Thursday 17th November, 2016

apcolborne 18 November, 2016 Villa154 Read more

Decoration progress, Thursday 17th November, 2016

apcolborne 18 November, 2016 Villa154 Read more

Bejmet tiling progress, Thursday 17th November, 2016

apcolborne 18 November, 2016 Villa154 Read more

Bathroom tiling progress, Thursday 17th November, 2016

apcolborne 18 November, 2016 Villa154 Read more

Plaster progress, Wednesday 16th November, 2016

apcolborne 16 November, 2016 Villa154 Read more

Carpentry progress, Wednesday 16th November, 2016

apcolborne 16 November, 2016 Villa154 Read more

Tiling progress, Wednesday 16th November, 2016

apcolborne 16 November, 2016 Villa154 Read more

Decoration progress, Wednesday 16th November, 2016

apcolborne 16 November, 2016 Villa154 Read more

Building works progress, Tuesday 15th November, 2016

apcolborne 16 November, 2016 Villa154 Read more

Plaster progress, Tuesday 15th November, 2016

apcolborne 16 November, 2016 Villa154 Read more

Bathroom tiling progress, Tuesday 15th November, 2016

apcolborne 16 November, 2016 Villa154 Read more

Carpentry progress, Tuesday 15th November, 2016

apcolborne 16 November, 2016 Villa154 Read more

Tadelakt progress, Tuesday 15th November, 2016

apcolborne 16 November, 2016 Villa154 Read more

Plumbing progress, Tuesday 15th November, 2016

apcolborne 16 November, 2016 Villa154 Read more

Decoration progress, Tuesday 15th November, 2016

apcolborne 16 November, 201616 November, 2016 Villa154 Read more

Building works progress, Monday 14th November, 2016

apcolborne 14 November, 2016 Villa154 Read more

Plaster progress, Monday 14th November, 2016

apcolborne 14 November, 201614 November, 2016 Villa154 Read more

Carpentry progress, Monday 14th November, 2016

apcolborne 14 November, 2016 Villa154 Read more

Tadelakt progress, Monday 14th November, 2016

apcolborne 14 November, 2016 Villa154 Read more

Decoration progress, Monday 14th November, 2016

apcolborne 14 November, 2016 Villa154 Read more

Bathroom tiling progress, Saturday 12th November, 2016

apcolborne 13 November, 2016 Villa154 Read more

Plaster progress, Saturday 12th November, 2016

apcolborne 13 November, 2016 Villa154 Read more

Decoration progress, Saturday 12th November, 2016

apcolborne 13 November, 2016 Villa154 Read more

Decoration progress, Friday 11th November, 2016

apcolborne 12 November, 201612 November, 2016 Villa154 Read more

Plaster progress, Friday 11th November, 2016

apcolborne 12 November, 2016 Villa154 Read more

General works progress, Thursday 10th November, 2016

apcolborne 12 November, 201612 November, 2016 Villa154 Read more

Plaster progress, Thursday 10th November, 2016

apcolborne 12 November, 201612 November, 2016 Villa154 Read more

Bathroom tiling progress, Thursday 10th November, 2016

apcolborne 12 November, 201612 November, 2016 Villa154 Read more

Tadelakt progress, Wednesday 9th November, 2016

apcolborne 12 November, 2016 Villa154 Read more

Plaster progress, Wednesday 9th November, 2016

apcolborne 12 November, 2016 Villa154 Read more

Decoration progress, Wednesday 9th November, 2016

apcolborne 12 November, 2016 Villa154 Read more

Bathroom tiling progress, Tuesday 8th November, 2016

apcolborne 8 November, 2016 Villa154 Read more

Carpentry progress, Tuesday 8th November, 2016

apcolborne 8 November, 2016 Villa154 Read more

Plaster progress, Tuesday 8th November, 2016

apcolborne 8 November, 2016 Villa154 Read more

Bathroom tiling progress, Saturday 5th November, 2016

apcolborne 6 November, 2016 Villa154 Read more

Plaster progress, Saturday 5th November, 2016

apcolborne 6 November, 2016 Villa154 Read more

Carrelage progress, Saturday 5th November, 2016

apcolborne 6 November, 2016 Villa154 Read more

Decoration progress, Saturday 5th November, 2016

apcolborne 6 November, 2016 Villa154 Read more

Carpentry progress, Saturday 5th November, 2016

apcolborne 6 November, 20166 November, 2016 Villa154 Read more

Electrical progress, Saturday 5th November, 2016

apcolborne 6 November, 2016 Villa154 Read more

Zellige progress, Thursday 3rd November, 2016

apcolborne 4 November, 2016 Villa154 Read more

Kitchen wall progress, Thursday 3rd November, 2016

apcolborne 4 November, 2016 Villa154 Read more

Tadelakt progress, Thursday 3rd November, 2016

apcolborne 4 November, 2016 Villa154 Read more

Carpentry progress, Wednesday 2nd November, 2016

apcolborne 2 November, 2016 Villa154 Read more

Tadelakt progress, Wednesday 2nd November, 2016

apcolborne 2 November, 2016 Villa154 Read more

Kitchen wall progress, Monday 31st October, 2016

apcolborne 1 November, 2016 Villa154 Read more

Tadelakt progress, Monday 31st October, 2016

apcolborne 1 November, 2016 Villa154 Read more

Bathroom progress, Monday 24th October, 2016

apcolborne 25 October, 2016 Villa154 Read more

Tadelakt progress, Monday 24th October, 2016

apcolborne 25 October, 2016 Villa154 Read more

Building works progress, Monday 24th October, 2016

apcolborne 25 October, 2016 Villa154 Read more

Plaster progress, Monday 24th October, 2016

apcolborne 25 October, 2016 Villa154 Read more

Carpentry progress, Monday 24th October, 2016

apcolborne 25 October, 2016 Villa154 Read more

Bathroom tiling progress, Saturday 22nd October, 2016

apcolborne 23 October, 2016 Villa154 Read more

Tadelakt progress, Saturday 22nd October, 2016

apcolborne 23 October, 2016 Villa154 Read more

Plaster progress, Saturday 22nd October, 2016

apcolborne 23 October, 201623 October, 2016 Villa154 Read more

Bathroom tiling progress, Friday 21st October, 2016

apcolborne 21 October, 2016 Villa154 Read more

Plaster progress, Friday 21st October, 2016

apcolborne 21 October, 2016 Villa154 Read more

Tadelakt progress, Friday 21st October, 2016

apcolborne 21 October, 2016 Villa154 Read more

Carpentry progress, Friday 21st October, 2016

apcolborne 21 October, 2016 Villa154 Read more

Testing swimming pool, Thursday 20th October, 2016

apcolborne 20 October, 2016 Villa154 Read more

Electrical installation progress, Thursday 20th October, 2016

apcolborne 20 October, 2016 Villa154 Read more

Kitchen wall progress, Thursday 20th October, 2016

apcolborne 20 October, 2016 Villa154 Read more

Carpentry progress, Thursday 20th October, 2016

apcolborne 20 October, 2016 Villa154 Read more

Tadelakt progress, Thursday 20th October, 2016

apcolborne 20 October, 2016 Villa154 Read more

Rose garden progress, Thursday 20th October, 2016

apcolborne 20 October, 2016 Villa154 Read more

Plaster progress, Thursday 20th October, 2016

apcolborne 20 October, 2016 Villa154 Read more

Testing swimming pool, Wednesday 19th October, 2016

apcolborne 20 October, 2016 Villa154 Read more

Electrical installation progress, Wednesday 19th October, 2016

apcolborne 20 October, 2016 Villa154 Read more

Bathroom tiling progress, Wednesday 19th October, 2016

apcolborne 20 October, 2016 Villa154 Read more

Planting rose garden, Wednesday 19th October, 2016

apcolborne 20 October, 2016 Uncategorized Read more

Carpentry progress, Wednesday 19th October, 2016

apcolborne 20 October, 2016 Villa154 Read more

Plaster progress, Wednesday 19th October, 2016

apcolborne 20 October, 2016 Villa154 Read more

Plaster progress, Tuesday 18th October, 2016

apcolborne 18 October, 2016 Villa154 Read more

Tadelakt progress, Tuesday 18th October, 2016

apcolborne 18 October, 2016 Villa154 Read more

Bathroom tiling progress, Tuesday 18th October, 2016

apcolborne 18 October, 2016 Villa154 Read more

Carpentry progress, Tuesday 18th October, 2016

apcolborne 18 October, 2016 Villa154 Read more

Decoration progress, Tuesday 18th October, 2016

apcolborne 18 October, 2016 Villa154 Read more

Tadelakt progress, Monday 17th October, 2016

apcolborne 17 October, 2016 Villa154 Read more

Bathroom tiling progress, Monday 17th October, 2016

apcolborne 17 October, 2016 Villa154 Read more

Carpentry progress, Monday 17th October, 2016

apcolborne 17 October, 2016 Villa154 Read more

Electrical installation, Monday 17th October, 2016

apcolborne 17 October, 2016 Villa154 Read more

Dess progress, Monday 17th October, 2016

apcolborne 17 October, 2016 Villa154 Read more

Testing fireplaces, Monday 17th October, 2016

apcolborne 17 October, 2016 Villa154 Read more

Bathroom tiling progress, Saturday 15th October, 2016

apcolborne 15 October, 2016 Villa154 Read more

Decoration progress, Saturday 15th October, 2016

apcolborne 15 October, 201615 October, 2016 Villa154 Read more

Pise progress, Saturday 15th October, 2016

apcolborne 15 October, 2016 Villa154 Read more

Planting rose garden, Friday 14th October, 2016

apcolborne 15 October, 2016 Villa154 Read more

Decoration progress, Friday 14th October, 2016

apcolborne 15 October, 2016 Villa154 Read more

Pise progress, Friday 14th October, 2016

apcolborne 15 October, 2016 Villa154 Read more

Bathroom tiling progress, Friday 14th October, 2016

apcolborne 15 October, 2016 Villa154 Read more

Planting rose garden, Thursday 13th October, 2016

apcolborne 13 October, 2016 Villa154 Read more

Decoration progress, Thursday 13th October, 2016

apcolborne 13 October, 2016 Villa154 Read more

Bathroom tiling progress, Thursday 13th October, 2016

apcolborne 13 October, 2016 Villa154 Read more

Carpentry progress, Wednesday 12th October, 2016

apcolborne 12 October, 2016 Villa154 Read more

Decoration progress, Wednesday 12th October, 2016

apcolborne 12 October, 2016 Villa154 Read more

Bathroom tiling progress, Wednesday 12th October, 2016

apcolborne 12 October, 2016 Villa154 Read more

Dess progress, Wednesday 12th October, 2016

apcolborne 12 October, 2016 Villa154 Read more

Bathroom tiling progress, Tuesday 11th October, 2016

apcolborne 11 October, 2016 Villa154 Read more

Gardening, Tuesday 11th October, 2016

apcolborne 11 October, 2016 Villa154 Read more

Dess progress, Tuesday 11th October, 2016

apcolborne 11 October, 201611 October, 2016 Villa154 Read more

Carpentry progress, Tuesday 11th October, 2016

apcolborne 11 October, 2016 Villa154 Read more

Decoration progress, Tuesday 11th October, 2016

apcolborne 11 October, 2016 Villa154 Read more

Carpentry progress, Tuesday 11th October, 2016

apcolborne 11 October, 2016 Villa154 Read more

General works, Monday 10th October, 2016

apcolborne 11 October, 2016 Villa154 Read more

Bathroom tiling progress, Monday 10th October, 2016

apcolborne 11 October, 2016 Villa154 Read more

Carpentry progress, Monday 10th October, 2016

apcolborne 11 October, 2016 Villa154 Read more

Dess progress, Monday 10th October, 2016

apcolborne 11 October, 201611 October, 2016 Uncategorized, Villa154 Read more

Bathroom tiling progress, Saturday 8th October, 2016

apcolborne 8 October, 2016 Villa154 Read more

Decorating progress, Saturday 8th October, 2016

apcolborne 8 October, 2016 Villa154 Read more

Carpentry progress, Saturday 8th October, 2016

apcolborne 8 October, 2016 Villa154 Read more

Tadelakt progress, Saturday 8th October, 2016

apcolborne 8 October, 20168 October, 2016 Villa154 Read more

Tadelakt progress, Friday 7th October, 2016

apcolborne 7 October, 2016 Villa154 Read more

Bathroom tiling progress, Friday 7th October, 2016

apcolborne 7 October, 2016 Villa154 Read more

Carpentry progress, Friday 7th October, 2016

apcolborne 7 October, 2016 Villa154 Read more

Decoration progress, Friday 7th October, 2016

apcolborne 7 October, 2016 Villa154 Read more

Tadelakt progress, Thursday 6th October, 2016

apcolborne 6 October, 2016 Villa154 Read more

Bathroom tiling progress, Thursday 6th October, 2016

apcolborne 6 October, 2016 Villa154 Read more

Carpentry progress, Thursday 6th October, 2016

apcolborne 6 October, 2016 Villa154 Read more

Olive trees, Wednesday 5th October, 2016

apcolborne 6 October, 2016 Villa154 Read more

Bathroom tiling progress, Wednesday 5th October, 2016

apcolborne 6 October, 20166 October, 2016 Villa154 Read more

Jardin Andalou, Wednesday 5th October, 2016

apcolborne 6 October, 2016 Villa154 Read more

Carpentry progress, Sunday 2nd October, 2016

apcolborne 2 October, 2016 Villa154 Read more

Planting Jardin Andalou, Sunday 2nd October, 2016

apcolborne 2 October, 2016 Villa154 Read more

Bejmet progress, Saturday 1st October, 2016

apcolborne 1 October, 2016 Villa154 Read more

Groundwork progress, Saturday 1st October, 2016

apcolborne 1 October, 2016 Villa154 Read more

Jardin Andalou progress, Saturday 1st October, 2016

apcolborne 1 October, 2016 Villa154 Read more

Carpentry progress, Saturday 1st October, 2016

apcolborne 1 October, 2016 Villa154 Read more

Painting progress, Friday 30th September, 2016

apcolborne 30 September, 2016 Villa154 Read more

Bathroom tiling progress, Friday 30th September, 2016

apcolborne 30 September, 2016 Villa154 Read more

Carpentry progress, Friday 30th September, 2016

apcolborne 30 September, 2016 Villa154 Read more

Bejmet progress, Friday 30th September, 2016

apcolborne 30 September, 2016 Villa154 Read more

Jardin Andalou progress, Friday 30th September, 2016

apcolborne 30 September, 2016 Villa154 Read more

Painting progress, Thursday 29th September, 2016

apcolborne 30 September, 2016 Villa154 Read more

Soil for Jardin Andalou, Thursday 29th September, 2016

apcolborne 30 September, 2016 Villa154 Read more

Bejmet progress, Thursday 29th September, 2016

apcolborne 30 September, 201630 September, 2016 Villa154 Read more

Groundwork progress, Thursday 29th September, 2016

apcolborne 30 September, 2016 Villa154 Read more

Bathroom tiling progress, Thursday 29th September, 2016

apcolborne 30 September, 2016 Villa154 Read more

Carpentry progress, Thursday 29th September, 2016

apcolborne 30 September, 2016 Villa154 Read more

Carpentry progress, Wednesday 28th September, 2016

apcolborne 28 September, 2016 Villa154 Read more

Clearing rubbish, Wednesday 28th September, 2016

apcolborne 28 September, 2016 Villa154 Read more

Painting progress, Wednesday 28th September, 2016

apcolborne 28 September, 2016 Villa154 Read more

Kitchen utility area, Wednesday 28th September, 2016

apcolborne 28 September, 2016 Villa154 Read more

Soil for jardin andalou, Wednesday 28th September, 2016

apcolborne 28 September, 2016 Villa154 Read more

Bathroom tiling progress, Wednesday 28th September, 2016

apcolborne 28 September, 2016 Villa154 Read more

Bejmet progress, Wednesday 28th September, 2016

apcolborne 28 September, 2016 Villa154 Read more

Painting progress, Tuesday 27th September, 2016

apcolborne 27 September, 201627 September, 2016 Villa154 Read more

Bejmet progress, Tuesday 27th September, 2016

apcolborne 27 September, 2016 Villa154 Read more

Carpentry progress, Tuesday 27th September, 2016

apcolborne 27 September, 201627 September, 2016 Villa154 Read more

Bathroom tiling progress, Tuesday 27th September, 2016

apcolborne 27 September, 2016 Villa154 Read more

Bejmet tiling progress, Monday 26th September, 2016

apcolborne 26 September, 2016 Villa154 Read more

Jardin andalou progress, Monday 26th September, 2016

apcolborne 26 September, 2016 Villa154 Read more

Carpentry progress, Monday 26th September, 2016

apcolborne 26 September, 201626 September, 2016 Villa154 Read more

Bathroom tiling progress, Monday 26th September, 2016

apcolborne 26 September, 2016 Villa154 Read more

Painting woodwork, Monday 26th September, 2016

apcolborne 26 September, 2016 Uncategorized, Villa154 Read more

Garden progress, Saturday 24th September, 2016

apcolborne 25 September, 2016 Villa154 Read more

Andalucian graden progress, Saturday 24th September, 2016

apcolborne 25 September, 2016 Villa154 Read more

Bathroom tiling progress, Saturday 24th September, 2016

apcolborne 25 September, 201625 September, 2016 Villa154 Read more

Bathroom tiling progress, Friday 23rd September, 2016

apcolborne 23 September, 2016 Villa154 Read more

Bathroom tiling progress, Thursday 22nd September, 2016

apcolborne 22 September, 2016 Villa154 Read more

Bathroom tiling progress, Wednesday 21st September, 2016

apcolborne 21 September, 201621 September, 2016 Villa154 Read more

Clearing Courtyard, Wednesday 21st September, 2016

apcolborne 21 September, 201621 September, 2016 Villa154 Read more

Site meeting, Tuesday 20th September, 2016

apcolborne 21 September, 2016 Villa154 Read more

Olive Tree progress in front of villa

apcolborne 20 September, 2016 Villa154 Read more

Bathroom tiling progress, Wednesday 7th September, 2016

apcolborne 7 September, 2016 Villa154 Read more

Bejmet Progress, Wednesday 7th September, 2016

apcolborne 7 September, 2016 Villa154 Read more

Bathroom tiling progress, Tuesday 6th September, 2016

apcolborne 7 September, 2016 Villa154 Read more

Bejmet progress, Tuesday 6th September, 2016

apcolborne 7 September, 2016 Villa154 Read more

Bejmet progress, Monday 5th September, 2016

apcolborne 7 September, 2016 Villa154 Read more

Groundwork progress, Monday 5th September, 2016

apcolborne 7 September, 2016 Villa154 Read more

Bathroom tiling progress, Monday 5th September, 2016

apcolborne 7 September, 20167 September, 2016 Villa154 Read more

Carpentry progress, Monday 5th September, 2016

apcolborne 7 September, 2016 Villa154 Read more

Groundworks progress, Saturday 3rd September, 2016

apcolborne 3 September, 2016 Villa154 Read more

Bejmet progress, Saturday 3rd September, 2016

apcolborne 3 September, 2016 Villa154 Read more

Bathroom tiling progress, Friday 2nd September, 2016

apcolborne 2 September, 2016 Villa154 Read more

Bejmet progress, Friday 2nd September, 2016

apcolborne 2 September, 2016 Villa154 Read more

Carpentry progress, Friday 2nd September, 2016

apcolborne 2 September, 2016 Villa154 Read more

Choosing door handles, Friday 2nd September, 2016

apcolborne 2 September, 2016 Villa154 Read more

Bathroom tiling progress, Thursday 1st September, 2016

apcolborne 1 September, 2016 Villa154 Read more

Carpentry progress, Thursday 1st September, 2016

apcolborne 1 September, 2016 Villa154 Read more

Bejmet progress, Thursday 1st September, 2016

apcolborne 1 September, 2016 Villa154 Read more

Asphalt progress, Thursday 1st September, 2016

apcolborne 1 September, 2016 Villa154 Read more

Groundworks progress, Wednesday 31st August, 2016

apcolborne 31 August, 2016 Villa154 Read more

Bejmet progress, Wednesday 31st August, 2016

apcolborne 31 August, 2016 Villa154 Read more

Bathroom tiling progress, Wednesday 31st August, 2016

apcolborne 31 August, 2016 Villa154 Read more

Carpentry progress, Tuesday 30th August, 2016

apcolborne 31 August, 2016 Villa154 Read more

Wall construction progress, Tuesday 30th August, 2016

apcolborne 31 August, 2016 Villa154 Read more

Groundwork progress, Monday 29th August, 2016

apcolborne 31 August, 2016 Villa154 Read more

Bejmet progress, Monday 29th August, 2016

apcolborne 31 August, 2016 Villa154 Read more

Bathroom tiling progress, Monday 29th August, 2016

apcolborne 31 August, 2016 Villa154 Read more

Wall construction progress, Thursday 25th August, 2016

apcolborne 25 August, 201631 August, 2016 Villa154 Read more

Groundwork progress, Thursday 25th August, 2016

apcolborne 25 August, 2016 Villa154 Read more

Small courtyard fountain progress, Thursday 25th August, 2016

apcolborne 25 August, 2016 Villa154 Read more

Door installation progress, Thursday 25th August, 2016

apcolborne 25 August, 2016 Villa154 Read more

Bathroom tiling progress, Thursday 25th August, 2016

apcolborne 25 August, 2016 Villa154 Read more

Bejmet progress, Thursday 25th August, 2016

apcolborne 25 August, 2016 Villa154 Read more

Bathroom tiling progress, Monday 22nd August, 2016

apcolborne 23 August, 2016 Villa154 Read more

Bejmet progress, Monday 22nd August, 2016

apcolborne 23 August, 201623 August, 2016 Villa154 Read more

External wall construction, Monday 22nd August, 2016

apcolborne 23 August, 201623 August, 2016 Villa154 Read more

External wall construction, Saturday 20th August, 2016

apcolborne 22 August, 2016 Villa154 Read more

Bathroom tiling progress, Saturday 20th August, 2016

apcolborne 22 August, 2016 Villa154 Read more

Waste system, Saturday 20th August, 2016

apcolborne 22 August, 2016 Villa154 Read more

Bathroom tiling, Friday 19th August, 2016

apcolborne 19 August, 2016 Villa154 Read more

Plumbing progress, Friday 19th August, 2016

apcolborne 19 August, 2016 Villa154 Read more

Bejmet progress, Friday 19th August, 2016

apcolborne 19 August, 2016 Villa154 Read more

Bathroom tiling progress, Friday 19th August, 2016

apcolborne 19 August, 2016 Villa154 Read more

Groundwork progress, Thursday 18th August, 2016

apcolborne 18 August, 2016 Villa154 Read more

Bathroom tiling progress, Thursday 18th August, 2016

apcolborne 18 August, 2016 Villa154 Read more

Bejmet progress, Thursday 18th August, 2016

apcolborne 18 August, 2016 Villa154 Read more

Groundwork progress, Wednesday 17th August, 2016

apcolborne 17 August, 2016 Villa154 Read more

Bathroom tiling progress, Wednesday 17th August, 2016

apcolborne 17 August, 2016 Villa154 Read more

Bathroom tiling progress, Tuesday 16th August, 2016

apcolborne 16 August, 2016 Villa154 Read more

Bejmet progress, Monday 15th August, 2016

apcolborne 15 August, 2016 Villa154 Read more

Groundworks, Monday 15th August, 2016

apcolborne 15 August, 2016 Villa154 Read more

Bejmet tiling progress, Saturday 13th August, 2016

apcolborne 14 August, 2016 Villa154 Read more

Internal floor progress, Saturday 13th August, 2016

Bathroom tiling progress, Saturday 13th August, 2016

apcolborne 14 August, 2016 Villa154 Read more

Groundwork progress, Saturday 13th August, 2016

apcolborne 14 August, 2016 Villa154 Read more

Bathroom tiling progress, Saturday 13th August, 2016

apcolborne 14 August, 2016 Villa154 Read more

Carpentry progress, Tuesday 9th August, 2016

apcolborne 9 August, 2016 Villa154 Read more

Bathroom tiling progress, Tuesday 9th August, 2016

apcolborne 9 August, 2016 Villa154 Read more

Internal floor progress, Tuesday 9th August, 2016

apcolborne 9 August, 2016 Villa154 Read more

Groundwork progress, Tuesday 9th August, 2016

apcolborne 9 August, 20169 August, 2016 Villa154 Read more

Internal floor progress, Saturday 6th August, 2016

apcolborne 8 August, 2016 Villa154 Read more

Bathroom tiling progress, Saturday 6th August, 2016

apcolborne 8 August, 20168 August, 2016 Villa154 Read more

Swimming pool local technique, Saturday 6th August, 2016

apcolborne 8 August, 2016 Villa154 Read more

Groundworks, Saturday 6th August, 2016

apcolborne 8 August, 2016 Villa154 Read more

Roof terrace tiling, Saturday 6th August, 2016

apcolborne 8 August, 2016 Villa154 Read more

Bathroom tiling progress, Friday 5th August, 2016

apcolborne 8 August, 2016 Villa154 Read more

Bejmet progress, Friday 5th August, 2016

apcolborne 8 August, 2016 Villa154 Read more

Swimming pool local technique, Friday 5th August, 2016

apcolborne 8 August, 2016 Villa154 Read more

Internal floor progress, Thursday 4th August, 2016

apcolborne 5 August, 2016 Villa154 Read more

Bathroom tiling progress, Thursday 4th August, 2016

apcolborne 5 August, 2016 Villa154 Read more

Wall construction, Thursday 4th August, 2016

apcolborne 5 August, 2016 Villa154 Read more

Carpentry progress, Thursday 4th August, 2016

apcolborne 5 August, 2016 Villa154 Read more

Draining inspection points progress, Thursday 4th August, 2016

apcolborne 5 August, 2016 Villa154 Read more

Bejmet tiling progress, Thursday 4th August, 2016

apcolborne 5 August, 2016 Villa154 Read more

Internal floor progress, Tuesday 2nd August, 2016

apcolborne 2 August, 2016 Villa154 Read more

Bathroom tiling progress, Tuesday 2nd August, 2016

apcolborne 2 August, 2016 Villa154 Read more

Fountain small courtyard, Tuesday 2nd August, 2016

apcolborne 2 August, 2016 Villa154 Read more

Swimming pool local technique progress, Tuesday 2nd August, 2016

apcolborne 2 August, 20162 August, 2016 Villa154 Read more

Carpentry progress, Tuesday 2nd August, 2016

apcolborne 2 August, 2016 Villa154 Read more

Bathroom tiling, Monday 1st August, 2016

apcolborne 1 August, 2016 Villa154 Read more

Internal doors, Monday 1st August, 2016

apcolborne 1 August, 2016 Villa154 Read more

External door frames being fitted, Saturday 30th July, 2016

External

apcolborne 31 July, 2016 Villa154 Read more

Internal floor tiling, Saturday 30th July, 2016

apcolborne 31 July, 2016 Villa154 Read more

Swimming pool local technique tiling, Saturday 30th July, 2016

apcolborne 31 July, 2016 Villa154 Read more

Bathroom tiling, Saturday 30th July, 2016

apcolborne 31 July, 201631 July, 2016 Villa154 Read more

Internal doors being fitted, Saturday 30th July, 2016

apcolborne 31 July, 2016 Villa154 Read more

Internal floors, Thursday 28th July, 2016

apcolborne 29 July, 2016 Villa154 Read more

First internal doors being fitted, Thursday 28th July, 2016

apcolborne 29 July, 2016 Villa154 Read more

Windows fitted, Thursday 28th July, 2016

apcolborne 29 July, 2016 Villa154 Read more

Bathroom tiling, Thursday 28th July, 2016

apcolborne 29 July, 201629 July, 2016 Villa154 Read more

Bhou in courtyard, Monday 18th July, 2016

apcolborne 18 July, 2016 Villa154 Read more

Interior floor progress, Monday 18th July, 2016

apcolborne 18 July, 2016 Villa154 Read more

Local technique in baesment, Monday 18th July, 2016

apcolborne 18 July, 2016 Villa154 Read more

Cold room progress, Monday 18th July, 2016

apcolborne 18 July, 2016 Villa154 Read more

Roof terrace tiling, Monday 18th July, 2016

apcolborne 18 July, 2016 Villa154 Read more

Local technique floor tiles, 15th July, 2016

apcolborne 15 July, 2016 Villa154 Read more

Roof terrace steps, Friday 15th July, 2016

apcolborne 15 July, 201615 July, 2016 Villa154 Read more

Cold room, Friday 15th July, 2016

apcolborne 15 July, 2016 Villa154 Read more

Basement bejmet floor, Thursday 14th July, 2016

apcolborne 15 July, 2016 Villa154 Read more

Internal floor progress, Thursday 14th July, 2016

apcolborne 15 July, 2016 Villa154 Read more

Cold room, Thursday 14th July, 2016

apcolborne 15 July, 2016 Villa154 Read more

Bejmet tile delivery, Wednesday 13th July, 2016

apcolborne 15 July, 2016 Villa154 Read more

Zellige bathroom tiles, Wednesday 13th July, 2016

apcolborne 15 July, 201615 July, 2016 Villa154 Read more

Internal floor bejmet, Wednesday 13th July, 2016

apcolborne 15 July, 2016 Villa154 Read more

Local technique, Tuesday 12th July, 2016

apcolborne 12 July, 2016 Villa154 Read more

Bhou seating in courtyard, Tuesday 12th July, 2016

apcolborne 12 July, 2016 Villa154 Read more

Windows being fitted, Tuesday 12th July, 2016

apcolborne 12 July, 2016 Villa154 Read more

Internal floor bejmet, Tuesday 12th July, 2016

apcolborne 12 July, 2016 Villa154 Read more

Bathroom wall zellige, Tuesday 12th July, 2016

apcolborne 12 July, 2016 Villa154 Read more

Carpentry progress, Saturday 2nd July, 2016

apcolborne 2 July, 20162 July, 2016 Villa154 Read more

General building progress, Thursday 30th June, 2016

apcolborne 30 June, 2016 Villa154 Read more

Tiling basement floor, Thursday 30th June, 2016

apcolborne 30 June, 2016 Villa154 Read more

Building works progress, Wednesday 29th June, 2016

apcolborne 29 June, 201629 June, 2016 Villa154 Read more

Internal floors progress, Wednesday 29th June, 2016

apcolborne 29 June, 2016 Villa154 Read more

Building works progress, Monday 27th June, 2016

apcolborne 27 June, 2016 Villa154 Read more

Internal floor progress, Monday 27th June, 2016

apcolborne 27 June, 2016 Villa154 Read more

Bejmet bedroom terraces, Thursday 23rd June, 2016

apcolborne 24 June, 201624 June, 2016 Villa154 Read more

Central courtyard, Thursday 23rd June, 2016

apcolborne 24 June, 2016 Villa154 Read more

Roof terrace, Thursday 23rd June, 2016

apcolborne 24 June, 2016 Villa154 Read more

Bedroom 6, Thursday 23rd June, 2016

apcolborne 24 June, 2016 Villa154 Read more

Roof terrace , Tuesday 21st June, 2016

apcolborne 21 June, 201621 June, 2016 Villa154 Read more

Central courtyard , Tuesday 21st June, 2016

apcolborne 21 June, 201621 June, 2016 Villa154 Read more

Bedroom terraces , Tuesday 21st June, 2016

apcolborne 21 June, 2016 Villa154 Read more

Internal floors , Tuesday 21st June, 2016

apcolborne 21 June, 2016 Villa154 Read more

Garden, Tuesday 21st June, 2016

apcolborne 21 June, 201621 June, 2016 Villa154 Read more

General building progress, Monday 20th June, 2016

apcolborne 20 June, 2016 Villa154 Read more

Bejmet on outside terraces, Monday 20th June, 2016

apcolborne 20 June, 2016 Villa154 Read more

General building progress, Saturday 18th June, 2016

apcolborne 18 June, 2016 Villa154 Read more

Bejmet on outside terraces, Saturday 18th June, 2016

apcolborne 18 June, 2016 Villa154 Read more

Bejmet tiling progress, Friday 17th June, 2016

apcolborne 17 June, 2016 Villa154 Read more

Bejmet progress, Thursday 16th June, 2016

apcolborne 16 June, 2016 Villa154 Read more

Asphalt progress, Thursday 16th June, 2016

apcolborne 16 June, 2016 Villa154 Read more

Hammam progress, Thursday 16th June, 2016

apcolborne 16 June, 2016 Villa154 Read more

Garden trenches, Wednesday 15th June, 2016

apcolborne 15 June, 2016 Villa154 Read more

Cold room progress, Wednesday 15th June, 2016

apcolborne 15 June, 2016 Villa154 Read more

Bejmet floor tiling progress, Wednesday 15th June, 2016

apcolborne 15 June, 2016 Villa154 Read more

Bejmet progress, Tuesday 14th June, 2016

apcolborne 14 June, 2016 Villa154 Read more

Garden progress, Tuesday 14th June, 2016

apcolborne 14 June, 2016 Villa154 Read more

Bejmet tiling progress, Monday 13th June, 2016

apcolborne 14 June, 2016 Villa154 Read more

General building progress, Monday 13th June, 2016

apcolborne 14 June, 201614 June, 2016 Villa154 Read more

Hammam progress, Monday 13th June, 2016

apcolborne 14 June, 2016 Villa154 Read more

General building progress, Saturday 11th June, 2016

apcolborne 11 June, 2016 Villa154 Read more

Floor tiling progress, Saturday 11th June, 2016

apcolborne 11 June, 2016 Villa154 Read more

Internal floors progress, Saturday 11th June, 2016

apcolborne 11 June, 2016 Uncategorized Read more

Plumbing progress, Saturday 11th June, 2016

apcolborne 11 June, 2016 Villa154 Read more

Carpentry progress, Saturday 11th June, 2016

apcolborne 11 June, 2016 Villa154 Read more

Hammam progress, Friday 10th June, 2016

apcolborne 10 June, 2016 Villa154 Read more

Carpentry progress, Friday 10th June, 2016

apcolborne 10 June, 2016 Villa154 Read more

Internal door progress, Friday 10th June, 2016

apcolborne 10 June, 2016 Villa154 Read more

Bathroom 6 zellige, Friday 10th June, 2016

apcolborne 10 June, 2016 Villa154 Read more

Internal floor progress, Thursday 9th June, 2016

apcolborne 9 June, 2016 Villa154 Read more

Carpentry progress, Thursday 9th June, 2016

apcolborne 9 June, 2016 Villa154 Read more

Building works in basement, Wednesday 8th June, 2016

apcolborne 8 June, 2016 Villa154 Read more

Trenches for garden lighting, Wednesday 8th June, 2016

apcolborne 8 June, 20168 June, 2016 Villa154 Read more

Internal floors progress, Wednesday 8th June, 2016

apcolborne 8 June, 20168 June, 2016 Villa154 Read more

Hammam progress, Wednesday 8th June, 2016

apcolborne 8 June, 2016 Villa154 Read more

Roof lights, Tuesday 7th June, 2016

apcolborne 7 June, 2016 Villa154 Read more

Zagora Palm trees, Tuesday 7th June, 2016

apcolborne 7 June, 2016 Villa154 Read more

Hammam progress, Tuesday 7th June, 2016

apcolborne 7 June, 2016 Villa154 Read more

Woodwork progress, Monday 6th June, 2016

apcolborne 6 June, 20166 June, 2016 Villa154 Read more

Ceiling fittings, Monday 6th June, 2016

apcolborne 6 June, 2016 Villa154 Read more

Hammam progress, Monday 6th June, 2016

apcolborne 6 June, 2016 Villa154 Read more

Internal floors, Monday 6th June, 2016

apcolborne 6 June, 2016 Villa154 Read more

Plaster progress, Monday 6th June, 2016

apcolborne 6 June, 2016 Villa154 Read more

Bejmet tiles from Fez, Monday 6th June, 2016

apcolborne 6 June, 2016 Villa154 Read more

Planting Zagora palm trees, Sunday 5th June, 2016

apcolborne 5 June, 2016 Villa154 Read more

Digging holes for new palm trees, Saturday 4th June, 2016

apcolborne 4 June, 2016 Villa154 Read more

Garden pergola, Saturday 4th June, 2016

apcolborne 4 June, 2016 Villa154 Read more

Carpentry progress, Saturday 4th June, 2016

apcolborne 4 June, 2016 Villa154 Read more

Internal floor progress, Saturday 4th June, 2016

apcolborne 4 June, 2016 Villa154 Read more

Plaster progress, Saturday 4th June, 2016

apcolborne 4 June, 2016 Villa154 Read more

Hammam progress, Saturday 4th June, 2016

apcolborne 4 June, 2016 Villa154 Read more

Plaster progress, Friday 3rd June, 2016

apcolborne 3 June, 2016 Villa154 Read more

Internal floor progress, Friday 3rd June, 2016

apcolborne 3 June, 2016 Villa154 Read more

Hammam progress, Friday 3rd June, 2016

apcolborne 3 June, 2016 Villa154 Read more

Basement rooms progress, Thursday 2nd June, 2016

apcolborne 2 June, 2016 Villa154 Read more

Constructing entrance path, Thursday 2nd June, 2016

apcolborne 2 June, 2016 Villa154 Read more

Pise wall progress, Thursday 2nd June, 2016

apcolborne 2 June, 2016 Villa154 Read more

Plaster progress, Thursday 2nd June, 2016

apcolborne 2 June, 2016 Villa154 Read more

Levelling internal floor progress, Thursday 2nd June, 2016

apcolborne 2 June, 2016 Villa154 Read more

Swimming pool local technique, Thursday 2nd June, 2016

apcolborne 2 June, 2016 Villa154 Read more

Plaster progress, Wednesday 1st June, 2016

apcolborne 1 June, 2016 Villa154 Read more

Internal floor leveling progress, Wednesday 1st June, 2016

apcolborne 1 June, 2016 Villa154 Read more

Pise wall rendering progress, Wednesday 1st June, 2016

apcolborne 1 June, 2016 Villa154 Read more

Swimming pool local technique progress, Wednesday 1st June, 2016

apcolborne 1 June, 2016 Villa154 Read more

Hammam progress, Wednesday 1st June, 2016

apcolborne 1 June, 2016 Villa154 Read more

Hammam progress, Tuesday 31st May, 2016

apcolborne 31 May, 2016 Villa154 Read more

Swimming pool local technique progress, Tuesday 31st May, 2016

apcolborne 31 May, 201631 May, 2016 Villa154 Read more

Plaster progress, Tuesday 31st May, 2016

apcolborne 31 May, 2016 Villa154 Read more

Pise progress, Tuesday 31st May, 2016

apcolborne 31 May, 2016 Villa154 Read more

General building progress, Monday 30th May, 2016

apcolborne 30 May, 2016 Villa154 Read more

Wall pise progress, Monday 30th May, 2016

apcolborne 30 May, 2016 Villa154 Read more

Levelling internal floors progress, Monday 30th May, 2016

apcolborne 30 May, 2016 Villa154 Read more

Swimming pool room, Monday 30th May, 2016

apcolborne 30 May, 2016 Villa154 Read more

Carpentry progress, Monday 30th May, 2016

apcolborne 30 May, 2016 Villa154 Read more

Pise wall rendering, Saturday 28th May, 2016

apcolborne 28 May, 2016 Villa154 Read more

Cold room ceiling, Saturday 28th May, 2016

apcolborne 28 May, 2016 Villa154 Read more

Internal floor leveling, Saturday 28th May, 2016

apcolborne 28 May, 201628 May, 2016 Villa154 Read more

Asphalt preparations, Saturday 28th May, 2016

apcolborne 28 May, 2016 Villa154 Read more

Plaster progress, Friday 27th May, 2016

apcolborne 27 May, 2016 Villa154 Read more

Pise wall progress, Friday 27th May, 2016

apcolborne 27 May, 2016 Villa154 Read more

Internal floors progress, Friday 27th May, 2016

apcolborne 27 May, 2016 Villa154 Read more

Planting orange trees, Friday 27th May, 2016

apcolborne 27 May, 2016 Villa154 Read more

Beldi house progress, Friday 27th May, 2016

apcolborne 27 May, 2016 Villa154 Read more

Pise rendering progress, Thursday 26th May, 2016

apcolborne 26 May, 2016 Villa154 Read more

Internal floor progress, Thursday 26th May, 2016

apcolborne 26 May, 2016 Villa154 Read more

Rendering basement rooms, Thursday 26th May, 2016

apcolborne 26 May, 2016 Villa154 Read more

Hammam progress, Thursday 26th May, 2016

apcolborne 26 May, 2016 Villa154 Read more

Plastering progress, Thursday 26th May, 2016

apcolborne 26 May, 2016 Villa154 Read more

Rendering basement rooms progress, Wednesday 25th May, 2016

apcolborne 25 May, 2016 Villa154 Read more

Pise wall rendering progress, Wednesday 25th May, 2016

apcolborne 25 May, 2016 Villa154 Read more

Internal floor progress, Wednesday 25th May, 2016

apcolborne 25 May, 2016 Villa154 Read more

Hammam progress, Wednesday 25th May, 2016

apcolborne 25 May, 201625 May, 2016 Villa154 Read more

Beldi house progress, Wednesday 25th May, 2016

apcolborne 25 May, 2016 Villa154 Read more

Water reservois progress, Wednesday 25th May, 2016

apcolborne 25 May, 201625 May, 2016 Villa154 Read more

Orange Trees, Wednesday 25th May, 2016

apcolborne 25 May, 2016 Villa154 Read more

Internal floor progress, Tuesday 24th May, 2016

apcolborne 24 May, 2016 Villa154 Read more

Pise wall rendering progress, Tuesday 24th May, 2016

apcolborne 24 May, 2016 Villa154 Read more

Beldi house progress, Tuesday 24th May, 2016

apcolborne 24 May, 2016 Villa154 Read more

Hammam progress, Monday 23rd May, 2014

apcolborne 23 May, 2016 Villa154 Read more

Rendering basement rooms, Monday 23rd May, 2014

apcolborne 23 May, 2016 Villa154 Read more

Tiling design for inner courtyard, Monday 23rd May, 2014

apcolborne 23 May, 2016 Villa154 Read more

Roof terrace tiling finished, Monday 23rd May, 2014

apcolborne 23 May, 2016 Villa154 Read more

External pise wall rendering, Monday 23rd May, 2014

apcolborne 23 May, 201623 May, 2016 Villa154 Read more

Villa Update, Monday 23rd May, 2016

apcolborne 23 May, 2016 Villa154 Read more

Levelling internal floors, Sunday 22nd May, 2016

apcolborne 22 May, 2016 Villa154 Read more

Deciding bathroom floor and wall tiling, Sunday 22nd May, 2016

apcolborne 22 May, 2016 Villa154 Read more

Carpentry progress, Saturday 21st May, 2016

apcolborne 22 May, 201622 May, 2016 Villa154 Read more

Creating new drainpipe, Saturday 21st May, 2016

apcolborne 22 May, 201622 May, 2016 Villa154 Read more

Tiling progress, Thursday 19th May, 2016

apcolborne 22 May, 2016 Villa154 Read more

Marking Hammam, Thursday 19th May, 2016

apcolborne 22 May, 2016 Villa154 Read more

Deciding bejmet designs, Thursday 19th May, 2016

apcolborne 22 May, 2016 Villa154 Read more

Fitting radiators, Thursday 19th May, 2016

apcolborne 22 May, 2016 Villa154 Read more

Tiling progress, Thursday 19th May, 2016

apcolborne 19 May, 201619 May, 2016 Villa154 Read more

Choosing bathroom sinks, Wednesday 18th May, 2016

apcolborne 18 May, 2016 Villa154 Read more

Roof tiling progress, Tuesday 17th May, 2016

apcolborne 17 May, 2016 Villa154 Read more

Carpentry progress, Tuesday 17th May, 2016

apcolborne 17 May, 2016 Villa154 Read more

General building progress, Monday 16th May, 2016

apcolborne 16 May, 2016 Villa154 Read more

Water reservoir tiling, Monday 16th May, 2016

apcolborne 16 May, 2016 Villa154 Read more

Tiling progress, Monday 16th May, 2016

apcolborne 16 May, 2016 Villa154 Read more

Plumbing progress, Saturday 14th May, 2016

apcolborne 14 May, 2016 Villa154 Read more

Radiator positioning progress, Saturday 14th May, 2016

apcolborne 14 May, 2016 Villa154 Read more

Basement cold room progress, Saturday 14th May, 2016

apcolborne 14 May, 2016 Villa154 Read more

Tiling progress, Saturday 14th May, 2016

apcolborne 14 May, 2016 Villa154 Read more

General progress, Friday 13th May, 2016

apcolborne 13 May, 2016 Villa154 Read more

Aligning radiator positions, Thursday 12th May, 2016

apcolborne 12 May, 2016 Villa154 Read more

Cold room, Thursday 12th May, 2016

apcolborne 12 May, 2016 Villa154 Read more

Tiling progress, Thursday 12th May, 2016

apcolborne 12 May, 2016 Villa154 Read more

General building progress, Wednesday 11th May, 2016

apcolborne 11 May, 2016 Villa154 Read more

Tiling water reservoir, Tuesday 10th May, 2016

apcolborne 10 May, 2016 Villa154 Read more

Tiling progress, Tuesday 10th May, 2016

apcolborne 10 May, 2016 Villa154 Read more

General building progress, Tuesday 10th May, 2016

apcolborne 10 May, 2016 Villa154 Read more

Building progress, Sunday 8th May, 2016

apcolborne 8 May, 2016 Villa154 Read more

Tiling progress, Saturday 7th May, 2016

apcolborne 7 May, 20167 May, 2016 Villa154 Read more

Building progress, Saturday 7th May, 2016

apcolborne 7 May, 2016 Villa154 Read more

Tiling progress, Friday 6th May, 2016

apcolborne 6 May, 2016 Villa154 Read more

Plaster progress, Friday 6th May, 2016

apcolborne 6 May, 2016 Villa154 Read more

Plumbing progress, Friday 6th May, 2016

apcolborne 6 May, 2016 Villa154 Read more

Building works, Friday 6th May, 2016

apcolborne 6 May, 2016 Villa154 Read more

Tiling progress, Thursday 5th May, 2016

apcolborne 5 May, 2016 Villa154 Read more

Building works progress, Thursday 5th May, 2016

apcolborne 5 May, 2016 Villa154 Read more

Plaster progress , Thursday 5th May, 2016

apcolborne 5 May, 2016 Villa154 Read more

Carpentry progress, Thursday 5th May, 2016

apcolborne 5 May, 2016 Villa154 Read more

Insulation for cold room, Thursday 5th May, 2016

apcolborne 5 May, 2016 Villa154 Read more

Tiling progress, Wednesday 4th May, 2016

apcolborne 4 May, 20164 May, 2016 Villa154 Read more

Carpentry progress, Tuesday 3rd May, 2016

apcolborne 3 May, 2016 Villa154 Read more

Tiling progress, Tuesday 3rd May, 2016

apcolborne 3 May, 2016 Villa154 Read more

Plaster progress, Tuesday 3rd May, 2016

apcolborne 3 May, 2016 Villa154 Read more

General building progress, Tuesday 3rd May, 2016

apcolborne 3 May, 2016 Villa154 Read more

Trenches progress, Tuesday 3rd May, 2016

apcolborne 3 May, 2016 Villa154 Read more

Carpentry progress, Monday 2nd May, 2016

apcolborne 2 May, 2016 Villa154 Read more

Tiling progress, Monday 2nd May, 2016

apcolborne 2 May, 20162 May, 2016 Villa154 Read more

Plaster progress, Monday 2nd May, 2016

apcolborne 2 May, 20162 May, 2016 Villa154 Read more

Digging trenches, Monday 2nd May, 2016

apcolborne 2 May, 2016 Villa154 Read more

Roof terrace tiling progress, Saturday 30th April, 2016

apcolborne 30 April, 2016 Villa154 Read more

Plaster progress, Saturday 30th April, 2016

apcolborne 30 April, 2016 Villa154 Read more

General building works, Saturday 30th April, 2016

apcolborne 30 April, 2016 Villa154 Read more

Digging trenches, Saturday 30th April, 2016

apcolborne 30 April, 2016 Villa154 Read more

General building progress, Friday 29th April, 2016

apcolborne 29 April, 2016 Villa154 Read more

Decorative metalwork for all windows, Friday 29th April, 2016

apcolborne 29 April, 2016 Villa154 Read more

Roof terrace tiling progress, Friday 29th April, 2016

apcolborne 29 April, 201629 April, 2016 Villa154 Read more

Plaster progress, Friday 29th April, 2016

apcolborne 29 April, 2016 Villa154 Read more

Plaster progress, Thursday 28th April, 2016

apcolborne 28 April, 2016 Villa154 Read more

Carpentry progress, Thursday 28th April, 2016

apcolborne 28 April, 2016 Villa154 Read more

Trench digging, Thursday 28th April, 2016

apcolborne 28 April, 2016 Villa154 Read more

Roof terrace tiling progress, Wednesday 27th April 2016

apcolborne 27 April, 2016 Villa154 Read more

Plastering progress, Wednesday 27th April 2016

apcolborne 27 April, 2016 Villa154 Read more

Carpentry progress, Wednesday 27th April 2016

apcolborne 27 April, 2016 Villa154 Read more

General building works, Wednesday 27th April 2016

apcolborne 27 April, 2016 Villa154 Read more

Digging trenches for electric cabling, Wednesday 27th April 2016

apcolborne 27 April, 2016 Villa154 Read more

Roof terrace tiling progress, Tuesday 26th April, 2016

apcolborne 26 April, 2016 Villa154 Read more

General building works, Tuesday 26th April, 2016

apcolborne 26 April, 2016 Villa154 Read more

General building works, Monday 25th April, 2016

apcolborne 25 April, 2016 Villa154 Read more

New olive trees, Sunday 24th March, 2016

apcolborne 24 April, 201625 April, 2016 Villa154 Read more

Building progress, Sunday 24th April, 2016

apcolborne 24 April, 2016 Villa154 Read more

Carpentry progress, Saturday 23rd April, 2016

apcolborne 23 April, 2016 Villa154 Read more

Roof terrace tiling progress, Saturday 23rd April, 2016

apcolborne 23 April, 201623 April, 2016 Villa154 Read more

Metalwork for windows, Friday 22nd April, 2016

apcolborne 22 April, 2016 Villa154 Read more

Carpentry progress, Friday 22nd April, 2016

apcolborne 22 April, 2016 Villa154 Read more

Roof terrace tiling progress, Friday 22nd April, 2016

apcolborne 22 April, 201622 April, 2016 Villa154 Read more

Water reservoir progress, Thursday 21st April, 2016

apcolborne 22 April, 2016 Villa154 Read more

Plaster progress, Thursday 21st April, 2016

  

apcolborne 22 April, 2016 Villa154 Read more

More olive trees, Thursday 21st April, 2016

apcolborne 22 April, 2016 Villa154 Read more

Plaster progress, Wednesday 20th April, 2016

apcolborne 20 April, 2016 Villa154 Read more

Planting olive trees, Wednesday 20th April, 2016

apcolborne 20 April, 201620 April, 2016 Villa154 Read more

Roof terrace progress, Wednesday 20th April, 2016

apcolborne 20 April, 2016 Villa154 Read more

Water reservoir progress, Wednesday 20th April, 2016

apcolborne 20 April, 2016 Villa154 Read more

Choosing tadelakt and zellige colours, Wednesday 20th April, 2016

apcolborne 20 April, 201620 April, 2016 Villa154 Read more

Start of bejmet tiling on roof terrace, Wednesday 20th April, 2016

apcolborne 20 April, 2016 Villa154 Read more

Digging holes for large olive trees, Wednesday 20th April, 2016

apcolborne 20 April, 201620 April, 2016 Villa154 Read more

Plaster progress, Tuesday 19th April, 2016

apcolborne 19 April, 2016 Villa154 Read more

Building works, Tuesday 19th April, 2016

apcolborne 19 April, 201619 April, 2016 Villa154 Read more

Beldi house progress, Tuesday 19th April, 2016

apcolborne 19 April, 201619 April, 2016 Villa154 Read more

Water reservoir progress, Tuesday 19th April, 2016

apcolborne 19 April, 2016 Villa154 Read more

Start of tiling of roof terrace, Tuesday 19th April, 2016

apcolborne 19 April, 2016 Villa154 Read more

Preparing tadelakt samples for bathroom walls, Tuesday 19th April, 2016

apcolborne 19 April, 2016 Villa154 Read more

Fifty trucks of soil delivered, Tuesday 19th April, 2016

apcolborne 19 April, 2016 Villa154 Read more

Marking entrance path to house, Monday 18th April, 2016

apcolborne 19 April, 2016 Villa154 Read more

Planning bejmet tiles for roof terrace, Monday 18th April, 2016

apcolborne 19 April, 2016 Villa154 Read more

Jardin Andalou, Monday 18th April, 2016

apcolborne 19 April, 201619 April, 2016 Villa154 Read more

Second screed on roof terrace finished, Monday 18th April, 2016

apcolborne 19 April, 201619 April, 2016 Villa154 Read more

Water reservoir progress, Monday 18th April, 2016

apcolborne 19 April, 201619 April, 2016 Villa154 Read more

Plasterer’s progress, Monday 18th April, 2016

apcolborne 19 April, 201619 April, 2016 Villa154 Read more

Beldi house progress, Monday 18th April, 2016

apcolborne 19 April, 2016 Villa154 Read more

Carpenter’s progress, Monday 18th April, 2016

apcolborne 19 April, 201619 April, 2016 Villa154 Read more

Beldi house progress, Sunday 17th April, 2016

apcolborne 18 April, 201618 April, 2016 Villa154 Read more

Second screed roof terrace, Sunday 17th April, 2016

apcolborne 18 April, 2016 Villa154 Read more

Groundwork, Sunday 17th April, 2016

apcolborne 18 April, 2016 Villa154 Read more

Plaster progress, Saturday 16th April, 2016

apcolborne 16 April, 2016 Villa154 Read more

Plumbing, Saturday 16th April, 2016

apcolborne 16 April, 2016 Villa154 Read more

Gardening, Saturday 16th April, 2016

apcolborne 16 April, 2016 Villa154 Read more

Roof terrace second screed, Saturday 16th April, 2016

apcolborne 16 April, 2016 Villa154 Read more

Plaster progress, Friday 15th April, 2016

apcolborne 15 April, 2016 Villa154 Read more

Plumbing progress, Friday 15th April, 2016

apcolborne 15 April, 201615 April, 2016 Villa154 Read more

Water reservoir progress, Friday 15th April, 2016

apcolborne 15 April, 2016 Villa154 Read more

Carpentry progress, Friday 15th April, 2016

apcolborne 15 April, 2016 Villa154 Read more

Plaster progress, Thursday 14th April, 2016

apcolborne 14 April, 2016 Villa154 Read more

Roof terrace second screed, Thursday 14th April, 2016

apcolborne 14 April, 2016 Villa154 Read more

Plumbing progress, Thursday 14th April, 2016

apcolborne 14 April, 201614 April, 2016 Villa154 Read more

Carpentry progress, Thursday 14th April, 2016

apcolborne 14 April, 2016 Villa154 Read more

Beldi house progress, Thursday 14th April, 2016

apcolborne 14 April, 2016 Villa154 Read more

Plaster progress, Wednesday 13th April, 2016

apcolborne 14 April, 201614 April, 2016 Villa154 Read more

Carpentry progress, Wednesday 13th April, 2016

apcolborne 14 April, 2016 Villa154 Read more

Water reservoir progress, Wednesday 13th April, 2016

apcolborne 14 April, 2016 Villa154 Read more

Plumbing progress, Wednesday 13th April, 2016

apcolborne 14 April, 2016 Villa154 Read more

Beldi house progress, Wednesday 13th April, 2016

apcolborne 14 April, 2016 Villa154 Read more

Plumbing progress, Tuesday 12th April, 2016

apcolborne 12 April, 2016 Villa154 Read more

Carpentry progress, Tuesday 12th April, 2016

apcolborne 12 April, 201612 April, 2016 Villa154 Read more

Plaster progress, Tuesday 12th April, 2016

apcolborne 12 April, 2016 Villa154 Read more

Beldi house progress, Tuesday 12th April, 2016

apcolborne 12 April, 201612 April, 2016 Villa154 Read more

Water reservoir progress, Tuesday 12th April, 2016

apcolborne 12 April, 201612 April, 2016 Villa154 Read more

Plumbing progress, Monday 11th April, 2016

apcolborne 11 April, 2016 Villa154 Read more

Beldi house progress, Monday 11th April, 2016

apcolborne 11 April, 2016 Villa154 Read more

Plaster progress, Monday 11th April, 2016

apcolborne 11 April, 2016 Villa154 Read more

Reservoir progress, Monday 11th April, 2016

apcolborne 11 April, 2016 Villa154 Read more

Beldi house progress, Sunday 10th April, 2016

apcolborne 10 April, 2016 Villa154 Read more

Water reservoir progress, Sunday 10th April, 2016

apcolborne 10 April, 2016 Villa154 Read more

Beldi house progress, Saturday 9th April, 2016

apcolborne 9 April, 20169 April, 2016 Villa154 Read more

Plaster progress, Saturday 9th April, 2016

apcolborne 9 April, 20169 April, 2016 Villa154 Read more

General building works, Saturday 9th April, 2016

apcolborne 9 April, 20169 April, 2016 Villa154 Read more

Testing asphalt, Saturday 9th April, 2016

apcolborne 9 April, 20169 April, 2016 Villa154 Read more

Plaster progress, Friday 8th April, 2016

apcolborne 8 April, 20168 April, 2016 Villa154 Read more

Plumbing, Friday 8th April, 2016

apcolborne 8 April, 20168 April, 2016 Villa154 Read more

Asphalt progress, Friday 8th April, 2016

apcolborne 8 April, 2016 Villa154 Read more

Water reservoir progress, Thursday 7th April, 2016

apcolborne 8 April, 2016 Villa154 Read more

Asphalt progress, Thursday 7th April, 2016

apcolborne 8 April, 2016 Villa154 Read more

Beldi house progress, Thursday 7th April, 2016

apcolborne 8 April, 20168 April, 2016 Villa154 Read more

Trench for electricity to garden, Wednesday 6th April, 2016

apcolborne 7 April, 2016 Villa154 Read more

General building progress, Wednesday 6th April, 2016

apcolborne 7 April, 2016 Villa154 Read more

Plaster progress, Wednesday 6th April, 2016

apcolborne 7 April, 2016 Villa154 Read more

Beldi house progress, Wednesday 6th April, 2016

apcolborne 7 April, 2016 Villa154 Read more

Water reservoir progress, Wednesday 6th April, 2016

apcolborne 7 April, 2016 Villa154 Read more

Raining today. No photos! Tuesday 5th April, 2016

apcolborne 7 April, 20167 April, 2016 Villa154 Read more

General building work, Monday 4th April, 2016

apcolborne 4 April, 2016 Villa154 Read more

Asphalt roof terrace progress, Monday 2nd April, 2016

apcolborne 4 April, 2016 Villa154 Read more

Beldi house progress, Monday 4th April, 2016

apcolborne 4 April, 2016 Villa154 Read more

Plaster progress, Monday 4th April, 2016

apcolborne 4 April, 2016 Villa154 Read more

Water reservoir commencement, Monday 4th April, 2016

apcolborne 4 April, 2016 Villa154 Read more

Plumbing progress, Monday 4th April, 2016

apcolborne 4 April, 2016 Villa154 Read more

General building progress, 3rd April, 2016

apcolborne 3 April, 2016 Villa154 Read more

Removing deep rooted weeds, Sunday 3rd April, 2016

apcolborne 3 April, 2016 Villa154 Read more

Beldi house progress, Sunday 3rd April, 2016

apcolborne 3 April, 2016 Villa154 Read more

Treating new olive trees, Sunday 3rd April, 2016

apcolborne 3 April, 2016 Villa154 Read more

Final preparations before asphalt on roof terrace, Sunday 3rd April, 2016

apcolborne 3 April, 2016 Villa154 Read more

Plaster progress, Sunday 3rd April, 2016

apcolborne 3 April, 20163 April, 2016 Villa154 Read more

Materials for water reservoir, Saturday 2nd April, 2016

apcolborne 3 April, 20163 April, 2016 Villa154 Read more

Removing deep weeds, Saturday 2nd April, 2016

apcolborne 2 April, 2016 Villa154 Read more

Plumbing for roof terrace, Saturday 2nd April, 2016

apcolborne 2 April, 2016 Villa154 Read more

Plaster progress, Saturday 2nd April, 2016

apcolborne 2 April, 2016 Villa154 Read more

Roof terrace asphalt, Saturday 2nd April, 2016

apcolborne 2 April, 2016 Villa154 Read more

Beldi house progress, Saturday 2nd April, 2016

apcolborne 2 April, 2016 Villa154 Read more

Carpenter’s on-site workshop, Friday 1st April, 2016

apcolborne 1 April, 2016 Villa154 Read more

General building progress, Friday 1st April, 2016

apcolborne 1 April, 2016 Villa154 Read more

General building progress, Thursday 31st March, 2016

apcolborne 31 March, 2016 Villa154 Read more

Plaster progress, Thursday 31st March, 2016

apcolborne 31 March, 2016 Villa154 Read more

Beldi House progress, Thursday 31st March, 2016

apcolborne 31 March, 2016 Villa154 Read more

Roof terrace cement screed finished, Wednesday 30th March, 2016

apcolborne 31 March, 201631 March, 2016 Villa154 Read more

Septic tanks finished, Wednesday 30th March, 2016

apcolborne 31 March, 2016 Villa154 Read more

Septic tank progress, Tuesday 29th March, 2016

apcolborne 30 March, 2016 Villa154 Read more

Roof terrace progress, Tuesday 29th March, 2016

apcolborne 30 March, 2016 Villa154 Read more

Plasterers start work, Tuesday 29th March, 2016

apcolborne 30 March, 2016 Uncategorized, Villa154 Read more

Planting Bouganvillea, Tuesday 29th March, 2016

apcolborne 29 March, 2016 Villa154 Read more

Beldi House progress, Tuesday 29th March, 2016

apcolborne 29 March, 201629 March, 2016 Villa154 Read more

Pruning newly planted olive trees, Monday 28th March, 2016

apcolborne 28 March, 2016 Villa154 Read more

Septic tank progress, Monday 28th March, 2016

apcolborne 28 March, 2016 Villa154 Read more

Beldi house wall construction, Monday 28th March, 2016

apcolborne 28 March, 2016 Villa154 Read more

Zellige Design, Monday 28th March, 2016

apcolborne 28 March, 2016 Villa154 Read more

General Progress, Sunday 27th March, 2016

apcolborne 27 March, 2016 Villa154 Read more

Roof Terrace floor screed. Saturday 26th March, 2016

apcolborne 26 March, 2016 Villa154 Read more

Palm Trees. Cocos Palms. Saturday 26th March, 2016

apcolborne 26 March, 2016 Villa154 Read more

Olive trees for main entrance to villa, Wednesday 23rd March, 2016

These trees were found in the foothills of the High Atlas.  Very old.  We’re moving 10 of these trees to create an alley leading to the main entrance of the villa.

apcolborne 23 March, 2016 Villa154 Read more

Phoenix Palms, Wednesday 23rd March, 2016

apcolborne 23 March, 2016 Villa154 Read more

Planting Cocos Palms, Wednesday 23rd March, 2016

apcolborne 23 March, 2016 Villa154 Read more

Planting Phoenix palm trees. Wednesday 23rd March, 2016

apcolborne 23 March, 201623 March, 2016 Villa154 Read more

Raining today and river in garden, Tuesday 22nd March, 2016

apcolborne 22 March, 201623 March, 2016 Villa154 Read more

Building Works, Tuesday 22nd March, 2016

apcolborne 22 March, 201623 March, 2016 Villa154 Read more

Planting Trees, Tuesday 22nd March, 2016

apcolborne 22 March, 201623 March, 2016 Villa154 Read more

Orange, Lemon and Palm tree delivery – Monday 21st March, 2016

apcolborne 21 March, 2016 Villa154 Read more

Windows for Beldi House

apcolborne 20 March, 201623 March, 2016 Villa154 Read more

Olive trees planted, Sunday 20th March, 2016

apcolborne 20 March, 201620 March, 2016 Villa154 Read more

Septic tank progress, Sunday 20th March, 2016

apcolborne 20 March, 2016 Villa154 Read more

Swimming pool toilet septic tank, Sunday 20th March, 2016

apcolborne 20 March, 2016 Villa154 Read more

Beldi House Progress, Sunday 20th March, 2016

apcolborne 20 March, 201620 March, 2016 Villa154 Read more

Olive tree delivery, Saturday 19th March, 2016

apcolborne 19 March, 2016 Villa154 Read more

Beldi House Progress, Saturday 19th March, 2016

apcolborne 19 March, 2016 Villa154 Read more

Groundwork. Saturday 19th March, 2016

apcolborne 19 March, 20161 April, 2016 Villa154 Read more

Holes dug for tree planting tomorrow

apcolborne 18 March, 2016 Villa154 Read more

Mud being prepared to make walls for Beldi house

apcolborne 18 March, 2016 Villa154 Read more

Beldi House Progress

apcolborne 18 March, 2016 Villa154 Read more

Visit to the stonemason for marble for the courtyard and fountain

apcolborne 18 March, 2016 Villa154 Read more

Marking out for olive tree planting. Friday 18th March, 2016

apcolborne 18 March, 20161 April, 2016 Villa154 Read more

Asphalt Preparation

apcolborne 17 March, 2016 Villa154 Read more

Garden Progress

apcolborne 17 March, 2016 Villa154 Read more

Builder’s on-site toilet

apcolborne 17 March, 201617 March, 2016 Villa154 Read more

Wood delivery

apcolborne 17 March, 2016 Villa154 Read more

Bejmet tiles

apcolborne 17 March, 2016 Villa154 Read more

Central Courtyard

apcolborne 17 March, 2016 Villa154 Read more

Septic tank progress

apcolborne 17 March, 2016 Villa154 Read more

Removal of thorny bushes with very deep roots

apcolborne 17 March, 2016 Villa154 Read more

Preparing mud for walls of Beldi House

apcolborne 17 March, 2016 Villa154 Read more

Groundwork

apcolborne 17 March, 201617 March, 2016 Villa154 Read more

Beldi House. Thursday 17th March, 2016

apcolborne 17 March, 20161 April, 2016 Villa154 Read more

Foundation of Beldi House. Wednesday 16th March, 2016

apcolborne 16 March, 20161 April, 2016 Villa154 Read more

Clearing site with JCB

apcolborne 14 March, 2016 Villa154 Read more

Foundations for Beldi house.

apcolborne 14 March, 2016 Villa154 Read more

Delivery of Bejmet tiles

apcolborne 14 March, 2016 Villa154 Read more

Puit Perdu

This well is the septic for the swimming pool shower and toilet.  Its been dug to 8m and fill with stone.  Now needs to be capped.

apcolborne 14 March, 2016 Villa154 Read more

Old Asphalt now cleared. Monday 14th March, 2016

apcolborne 14 March, 20161 April, 2016 Villa154 Read more

Garden Plan. Sunday 13th March, 2016

Initial garden plan.  50 olive trees, 44 palm trees, 40 fruit trees, etc.

apcolborne 13 March, 20161 April, 2016 Villa154 Read more

Carpentry Workshop

The carpentry workshop being set up in the lounge.

apcolborne 12 March, 2016 Villa154 Read more

Shifting olive trees for Beldi house

apcolborne 12 March, 2016 Villa154 Read more

Final asphalt removal

apcolborne 12 March, 2016 Villa154 Read more

Removing Old Asphalt. Saturday 12th March, 2016

apcolborne 12 March, 20161 April, 2016 Villa154 Read more

Digging a well, Septic Tank and Electrical Installation. Friday 11th March, 2016

apcolborne 11 March, 20161 April, 2016 Villa154 Read more